Specify allowable time increment and minimum time entry, per project
Marc Esser
Hi, our clients require that we log time in 15-minute increments; some projects in the legal space require 6 minutes. Also, some projects (or clients) have minimums, even if less actual time was spent. Currently the system allows any entry in one minute increments with no minimum. Can we get a PER-PROJECT setting please that specifies the allowed increment and the smallest allowed time entry? This would reduce user errors and manual admin revisions quite a bit. Thank you.